Project Description

HOTELS

ADDITIONAL PROJECTS

A/A PROJECT DESIGN STAGE MEP BUDGET
1 PERSONEL BUILDING IN ” NAVARINO DUNES ” HOTEL DETAILED 2.200.000
2 D & E BUILDINGS IN THE 180-BED HOTEL IN THE ILIA – PYRGOS GREECE (ALDEMAR A.E.) DETAILED 2.200.000
3 ” AMALIA ” HOTEL IN OLYMPIA DETAILED 3.000.000
4 HOTEL COMPLEX IN PYLOS (TEMES SA) PRELIMINARY 40.000.000
5 RESORT HOTEL IN OLYMPIA PRELIMINARY 28.000.000
6 HOTEL IN VOLOS (THESSALY TOURISM SA)) DETAILED 1.500.000
7 LUXURY APARTMENTS IN ELOUNDA CRETE (HERMES SA) DETAILED 2.100.000
8 MULTIPURPOSE HALL AT ROYAL OLYMPIC HOTEL IN ATHENS DETAILED 1.470.000
9 HOTEL COMPLEX IN ALMYRIDA CHANIA CRETE DETAILED 600.000
10 REPAIRS AT THE CAP D’OR HOTEL IN PORTO HELI DETAILED 500.000
11 ASTIR PALACE HOTEL IN CORFU DETAILED 350.000
12 FITTING OUT WORKS AT “RADION” HOTEL IN KAMENA VOURLA FINAL 2.000.000
13 HOTEL IN OIA SANTORINI DETAILED 300.000
14 HOTEL “FILOXENIA” IN KYTHIRA DETAILED 1.000.000
15 250 BED HOTEL IN PSOMA MARATHON AEGINA DETAILED 3.500.000
16 120 BED HOTEL IN KEFALONIA DETAILED 1.200.000
17 CLASS A HOTEL IN LEMNOS DETAILED 2.000.000
18 HOTEL IN VLICHA – RHODES ISLAND (LINDIAKA HOTELS SA) DETAILED 12.000.000
19 80 BED CLASS HOTEL IN PAROS DETAILED 350.000
20 ACCOMMODATION ROOMS FOR RENT IN ATHENS DETAILED 200.000
21 FITTING OUT WORKS AT “RADION” HOTEL IN KAMENA VOURLA FINAL 150.000
22 5 – STAR HOTEL IN GAROUBENA, ANO MERA OF MYKONOS DETAILED 1.100.000
23 HOTEL IN PAROS (FILIZILAND HOTEL I.K.E.) DETAILED 900.000