The 7th floor of the Hygeia hospital was completely remodeled with the creation of a new 12-bed intensive care unit on the one hand and a 10-bed intensive care unit on the other, two of which can be converted into intensive care units and the other two into negative pressure rooms. Also, an operating room on the 3rd floor of the hospital was a completely remodeled. The budget of the E / M facilities was 600.000.